Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - SEWER HCS CONNECT
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/29/2004 | PLUMBING - SEWER HCS CONNECT | Approved | IVRS - Inspection :*/M-H #4 VACUUM TEST OK. M-H #3 VACUUM TEST OK. M-H #2 VACUUM TEST OK. H-H #1 VACUUM TEST OK. | |
| 09/28/2004 | PLUMBING - SEWER HCS CONNECT | Partial Approval | IVRS - Inspection :*/1)FROM M-H #1 - HCS #2 - TEST OK 3.5LBS 4.50 MIN 2)FROM M-H #1 - TO M-H #5 PCWWM WITH HCS #1 3.5 LBS - 10.00 MIN TEST OK. 3)FROM M-H #2 TO HCS #4 3.5LBS FOR 6 MIN. 4)FROM M-H #3 TO M-H #4 3.5LBS FOR 9.50 MIN. HCS #5 TEST OK 3.5LBS FOR 5.5 MIN. | |
| 09/10/2004 | PLUMBING - SEWER HCS CONNECT | Partial Approval | IVRS - Inspection :*/MAIN LINES ONLY ALSO HCS FOR #1. HCS #2=6" HCS #4 APROX LOCATION=6" HCS #6=6" SDR 35-NEED REVISIOR HCS #8=6" SDR 35 PLEASE PROVIDE APPROVED REVISED PLAN BY NEXT INSP LETTER ON JOB AT THIS TIME FOR REVISIONS PROVIDE PLAN. CONTRACTOR WILL PROVIDE VARIFICATION OF GRADE. ALSO TEST AT LATER DATE/WILL REQUIRE VACUUM TEST ON M-H |