Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/15/2004 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* | |
| 09/07/2004 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999*/ 1) PRESSURE GAUGE DOES NOT WORK. NEEDLE DOESN'T MOVE WHEN AIR IS RELEASED 2) PROVIDE AN ENCLOSURE AROUND WATER HEATER. VENT FROM WATER HEATER NOT TO CODE. MUST HAVE MINIMUM 1" CLEARANCE FROM COMBUSTIBLES FOR DBL WALL PIPE. YOU CANNOT USE SINGLE WALL IN BETWEEN DBL WALL. PROVIDE A ROOF JACK AT PENETRATION THRU THE ROOF. RECALL FOR INSPECTION |