Permit: T04PL01533

Parcel: 115050720

Inspection Status: Approved

Inspection History: PLUMBING - GAS PRESSURE TEST

Date Description Inspector Results Comments
09/08/2004 PLUMBING - GAS PRESSURE TEST Approved IVRS - Inspection :*
09/07/2004 PLUMBING - GAS PRESSURE TEST Not ready for Inspection IVRS - Inspection :*/1)A MINIMUM TEN POUND TEST IS REQUIRED
2)WHERE UNIONS ARE NECESSARY, A RIGHT, LEFT, NIPPLE AND COUPLING SHALL BE USED AN ALTERNATE METHOD WOULD BE TO INSTALL AN APPROVED VALVE ON THE METER SIDE OF THE UNION
3)ALL FITTINGS AND PIPE MARRED BY WRENCHES TO BE PRIMED AND TAPED.