Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/08/2004 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* | |
| 09/03/2004 | PLUMBING - GAS PRESSURE TEST | Partial Approval | IVRS - Inspection :*/5819 IS OK FOR GAS 1)SYSTEM TO HOLD MINIMUM 10 PSI FOR 15 MINUTES 2)WATER HEATER T&P DRAIN TO BE RIDGID PIPING & GRAVITY DRAIN TO DAYLIGHT 3)WATER HEATER VENT TO BE 3' ABOVE TOP OF COLLER INTAKE WITH APP CAP |
|
| 09/02/2004 | PLUMBING - GAS PRESSURE TEST | Partial Approval | IVRS - Inspection :11 PSI AIR TEST FROM NEW METER LOCATION OVERHEAD TO WATER HEATER, EXISTING BUILDING SERVICE TO FURNACES AND STOVE OK PROVIDE UPPER & LOWER COMBUSTION AIR FOR WATER HEATER ENCLOSURE PROVIDE BONDING OF BUILDING GAS PIPING VENT FROM FURNACE WHEN WITHIN 10' OF COOLER INTAKE TO BE 3' ABOVE TOP OF COOLER |