Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/10/2004 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* | |
| 11/08/2004 | PLUMBING - GAS PRESSURE TEST | Partial Approval | IVRS - Inspection :*/12 PSI AIR TEST FROM METER TO WATER HEATER AND FURNACE OK 1)SEE NOTES #2 & #4 WATER HEATER TEMPURATURE PRESSURE RELIEF REQUIRES GRAVITY DRAIN TO EXTERIOR OF STRUCTURE | |
| 08/25/2004 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999*/DENIED 1) MINIMUM 10 PSI TEST ON GAS SYSTEM AT TIME OF INSPECTION 2)PROVIDE BONDING OF BUILDING GAS PIPING 3) WATER HEATER REQUIRES UPPER & LOWER COMBUSTION AIR TO CLOSET 4) WATER HEATER TEMPERATURE & PRESSURE RELILEF REQUIRES GRAVITY DRAIN TO DAYLIGHT OR CITY SIGNED PETITION OF APPREAL ON SITE WITH CORRECT INSTALLICATION 5) VENT FROM WATER HEATER & FURANCE WITHIN 10' OF COOLER INTAKE TO BE 3' ABOVE TOP OF COOLER 6) WHERE UNIONS ARE NECESSARY LEFT & RIGHT NIPPLE COUPLINGS SHALL BE USED |