Inspection Status: Partial Approval
Inspection History: PLUMBING - ROUGH, SOIL
| Date |
Description |
Inspector |
Results |
Comments |
| 01/10/2005 |
PLUMBING - ROUGH, SOIL |
|
Partial Approval |
IVRS - Inspection :*HAVE LETTER ON COUPLINGS FROM RICK FROM M-H # 2- TO M-H#3. TEST OK FROM M-H #2 OK TO #1 WILL REQUIRE ?? OF GRADE & VACUUM TEST ON MANHOLE |
| 01/04/2005 |
PLUMBING - ROUGH, SOIL |
|
Not ready for Inspection |
IVRS - Inspection :*LETTER ON FILE FROM RICK ENGINEERING ACCEPTABLE USE OF UNLIVED D.I.P IS ACCEPTABLE & ALSO USE OF SADDLE ON DIP IS ACCEPTABLE. THIS LETTER WILL GO TO FILES |
| 01/03/2005 |
PLUMBING - ROUGH, SOIL |
|
Not ready for Inspection |
IVRS - Inspection :*NOT READY |
| 12/27/2004 |
PLUMBING - ROUGH, SOIL |
|
Partial Approval |
IVRS - Inspection :*/ALL HCS HAVE BEEN INSTALLED CONTRACTOR WILL PROVIDE TEST AT LATER DATE. WILL REQUIRE VARIFACATION OF GRADE & VACUUM TEST ON MAN HOLE. PLEASE PROVIDE REVISION OF SPEC FOR 5" DIP-SPEC CALLS FOR SP2000 HAS NOT BEEN INSTALLED, ALSO LETTER FROM ENGINEER FOR USE -6 SADDLE ON DIP. ALSO SIV. SHEETS FOR BEDDING |
| 12/21/2004 |
PLUMBING - ROUGH, SOIL |
|
Partial Approval |
IVRS - Inspection :*/PARTIAL ON SEWER TRUNK ONLY - HCS FOR LOT 114, 113 & 109 ONLY. PLEASE PROVIDE REVISIOH ON SPEC FOR 4" DIP. SP-2000 HAS NOT BEEN INSTALLED AT THIS TIME, ALSO NEED LETTER ON SADDLE ON DIP? WILL REQUIRE TEST AT LATER DATE. VARIFICATION OF GRADE & VACUUM TEST ON M-H |
| 12/09/2004 |
PLUMBING - ROUGH, SOIL |
|
Not ready for Inspection |
IVRS - Inspection :* |
| 12/02/2004 |
PLUMBING - ROUGH, SOIL |
|
Not ready for Inspection |
IVRS - Inspection :* |
| 11/08/2004 |
PLUMBING - ROUGH, SOIL |
|
Not ready for Inspection |
IVRS - Inspection :*/1)HAD PRE CONSTRUCTION MEETING ON SITE SEWER INSPECTION REQUIREMENTS WITH SUPERINTENDENT |