Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/21/2004 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* 1) PRESSURE TEST OK 2) CORRECTIONS MADE OK 3) OK FOR GAS 4) CARD LEFT AT METER | |
| 08/24/2004 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999*/DENIED 1) PROVIDE 0-15 PSI TEST GAUGE AND PROVIDE MINIMUM 10PSI TEST ON ENTIRE GAS PIPING SYSTEM. 2)PROVIDE AGA OR CSA APPROVED GAS VALVES AT ENTRANCE AND AT ALL APPLIANCES 3)WATER HEATER TEMPURATURE & PRESSURE RELIEF GO GRAVITY DRAW TO DAYLIGHT OR PROVIDE CITY SIGNED PETITION OF APPEAL ON SITE WITH PROPER INSTALLATON. 4)VENT FROM FURANCE TO UNIT UPWARD TO ROOF AND BE SOLURED PROPERLY WITH NO TAPE AT TRANSITION FROM SINGLE TO DOUBLE WALL VENT PIPING 5) VENT FROM WATER HEATER TO HAVE APPROVED CAP ON ROOF 6)WATER HEATER TO BE ON APPROVED STAND OR BE ON FLOOR 7)PROAVIDE BONDING OF BUILDING GAS PIPING THIS MAY NOT BE A COMPLETE LIST |