| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/21/2004 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* | |
| 09/15/2004 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : SEE NOTE 1 FROM 09/8/04 INSPECTION |
|
| 09/08/2004 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :*/1) 10 PSI AIR TEST SHALL BE ON ENTIRE SYSTEM AT TIME OF INSPECTION AND HOLD WITH NO PRESSURE DROP FOR 15 MINUTES 2) USE EITHER COPPER OR STEEL PIPING FOR T&P DRAINS OR PROVIDE DIGCOCTRIC? UNIONS FOR TRANSITION. |
|
| 08/31/2004 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999*/1)WHERE UNIONS ARE NECESSARY LEFT-RIGHT NIPPLES & COUPLINGS SHALL BE USED (2) ON ROOF (2) AT MOTOR 2)ENTIRE GAS SYSTEM SHALL BE 10PSI TEST AT TIME OF INSPECTIONS 3)RIGID PIPE WATER HEATER T&P DRAIN GRAVITY DRAIN T DAYLIGHT-NO FLEXS |
|
| 08/23/2004 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :*/NOT READY 1) 10 PSI MINIMUM PROSSURE TEST OUTING GAS AT TIME OF INSPECTION 2)WITONG? UNIONS ARE NECESSARY RIGHT-LEFT NIPPLES & COUPLINGS SHALL BE USED 3) PROVIDE BONDING OF BUILDING GAS PIPING 4) PROVIDE AGA OR CSA APPROVED GAS VALVES AT ALL APPLIANCES 5) WATER HEATERS TEMPURATURE & PRESSURE RELIEF DRAINS TO GRAVITY DRAIN TO DAYLIGHT AND STORMWATER AT 90 DEGREES DOWN 6" TO 24" FROM FINISH GRADE WITH APPROVED PIPING MATERIALS. 6) SECURE ALL PIPING WITH APPROVED CLAMPS AND AT 8' INTERVALS. 7) PROVIDE LOWER COMBUSTION AIR FOR WATER HEATER. |