Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/26/2004 | PLUMBING - FINAL | Approved | IVRS - Inspection :*/APPROVED 25 PSI AIR TEST FROM METER 1" SCOTCH COAT UNDER GROUND TO EXISTING BLD. SERVICE EXTENDING TO WATER HEATER, STOVE AND FURANCE GAS CARD AT METER |
|
| 08/24/2004 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999*/DENIED- 1) REMOVE THREAD PROTOCTOR AT STOVE AND USE APPROVED CUPLING 2) WATER HEATER T&P DRAIN TO 90 DEGREE DOWN AT TERMINATION AND HAVE UN THREADED INSP 3) HAVE WATER HEATER APPLIED TO YOUR PERMIT 4) PLEASE PROVIDE 0-15 PSI PRESSURE TEST GAUGE AND RETEST SYSTEM 5) VENT FROM WATER HEATER TO BE 3' ABOVE TOP OF COOLER WHEN WITHIN 10' OF COOLER INTAKE AND SECURED PROPENCY 6) PROVIDE LOWER COMBUSTION AIR FOR WATER HEATER CLOSET. |