Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/13/2005 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* 1) PLEASE CALL IN ALL REQUIRED INSPECTIONS. 2) SEE NOTE #2 FROM 31405 SEE NOTE #3 FROM 31405 SEE NOTE #8 FROM 31405. 3) INSULATE ALL EXPOSED EXTERIOR WATER PIPING. 4) MAKE ALL CONNECTIONS-FLEX MAY NOT PASS THRU WALL OR PARTITION. 5) WHY IS WATER HEATER HOOKED UP BACKWARDS. | |
| 03/14/2005 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) SEE NOTES FROM 3/2/05 INSPECTION. 2) THREAD PROTECTOR AT METER LOCATION NOT APPROVED COUPLING. 3) REMOVE CAPPED T? IN PIPING AT METER LOCATION. 4) VENTS FROM WATER HEATER & FURNACE TO BE FLASHED AT ROOF AND WHEN WITHIN 10' OF COOLER INTAKE TO BE 3' ABOVE TOP OF COOLER INTAKE WITH APPROVED MATERIALS & APPROVED VENT CAPS. 5) PIPING TO HAVE ROOF FLASHINGS AT PENETRATIONS THRU ROOF. 6) WATER HEATER TEMPERATURE & PRESSURE RELIEF DRAIN TO PIPED GRAVITY DRAIN TO DAYLIGHT. 7) ALL PIPING TO BE SUPPPORTED & SECURED CORRECTLY. 8) PROVIDE BONDING OF BUILDING GAS PIPING. 9) PROVIDE APPROVED VENT FROM WATER HEATER THRU ROOF. 10) SEAL ALL PIPING PENETRATION INTO BUILDING. |
|
| 03/02/2005 | PLUMBING - GAS PRESSURE TEST | Cancelled | PER PHONE CALL RECEIVED ON 3/2/05 AT 8:20 AM | |
| 03/02/2005 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* 1) REPIPE NOT RECONNECT 2) IN LINE UNIONS NOT PERMITTED. 3) REQUIRE 10# TEST ON SYSTEM. 4) PIPING MAY NOT BE BENT OR STRAINED. 5) REQUIRE FLASHING THRU ROOF. 6) WATER HEATER NOT APPROVED MAY NOT A A COMPLETE LIST. |