Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/18/2004 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 08/18/2004 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :*/ 1) SEE NOTE #1 FROM 8/11/04 MUST HAVE A MINIMUM 12" OF COVER AT ALL POINTS 2) ALL SCOTCH COATING MARRED BY WRENCHES TO BE PRIMED AND TAPED | |
| 08/11/2004 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :*/NR 1)SEE NOTE #1 FROM 8/11/04 MUST HAVE A MINIMUM 12" OF COVER AT ALL POINTS! 2)ALL SCOTCH COATING MARREEL BY WRENCHES TO BE PRIMED AND TAPED. |