Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/30/2004 | PLUMBING - FINAL | Approved | IVRS - Inspection :* CORRECTION MADE. GAS CARD AT METER | |
| 09/28/2004 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* | |
| 09/21/2004 | PLUMBING - FINAL | Denied | IVRS - Inspection : 13 PSI AIR TEST ON NOW 3/4" ABOVE GRADE TO EXISITING SERVICE ENTRANCE, TO WATER HEATER, STOVE & WALL HEATER. 1) ? FROM WALL HEATER TO BE VERTICAL SEE SECTION 516.0 94 UPC AND BE 2" ABOVE TOP OF COOLER INTAKE. 2) SEE NOTE # 3 FROM 8/19/04 INSPECTION. 3) ? FROM WATER HEATER TO HAVE 1" CLEARANCE ALL THE WAY AROUND IT AT ROOF PENETRATION FROM COMBUSTABLES AND TERMINATE 2'ABOVE TOP OF ROOF |
|
| 08/19/2004 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* |