Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/20/2004 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 08/04/2004 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :WHERE UNIONS ARE NECESSARY USE COUPLING OR LEFT-RIGHT NIPPLE & COUPLING ROOF FLASHINGS ARE REQUIRED AT ROOF PENETRATIONS PROVIDE BONDING OF BUILDING GAS PIPING SECURE PIPING IN WATER HEATER CLOSET PROVIDE MIN 100 SQ INCH UPPER & LOWER COMBUSTION AIR TO WATER HEATER CLOSET AT UPPER 12" AND LOWER 12" VENTS FROM WATER HEATER & FURNACE TO BE INSTALLED AND SUPPORTED PROPERLY WATER HEATER TEMP & PRESSURE RELIEF DRAIN WILL REQUIRE PETITION OF APPEAL WITH PROPER INSTALLATION SIGNED BY CITY ON SITE |