Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/09/2005 | PLUMBING - FINAL | Approved | IVRS - Inspection :* 1) GAS PRESSURE TEST IS OK 2) GAS SHUT OFF VALVES ARE OK. 3) WATER HTR ENCLOSURE AND WATER HTR FLU VENT, T & P VALVE IS OK 4) ALL CORRECTIONS HAVE BEEN MADE. | |
| 03/04/2005 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) SHALL INSTALL WATER HTR FLU VENT THRU ROOF MIN OF 5' IN LENGTH. 2) CANNOT HAVE A FLEX CONNECTOR PASS THRU THE WALL @ WALL FURNACE. 3) SHALL CAP OFF ALL APPLIANCES THAT ARE NOT INSTALLED @TIME OF INSPECTION. 4) SHALL PROVIDE WATER HTR ENCLOSURE @ TIME OF FINAL INSPECTION. 5) OK TO BACKFILL TRENCH. 6) RE TEST SYSTEM @ TIME OF FINAL INSPECTION. | |
| 02/18/2005 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* NO COMMENTS ON PAPERWORK-JK |
|
| 10/28/2004 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) GAS PIPING MAY NOT PASS UNDER THE BUILDING WATER HEATER HAS NO ENCLOSURE. PROVIDE PERMIT AND PLAN FOR EXTENSIVE REMODEL INCLUDING NEW WATER PIPING, NEW WASTE PIPING. CONTRACTOR TO PAY REINSPECTION FEE. |
|
| 08/05/2004 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* |