Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date |
Description |
Inspector |
Results |
Comments |
| 08/03/2004 |
PLUMBING - GAS PRESSURE TEST |
|
Approved |
IVRS - Inspection :*/ 1) 15 PSI TEST IS OK. LEFT GAS CARD. OK TO BACKFILL TRENCH |
| 08/02/2004 |
PLUMBING - GAS PRESSURE TEST |
|
Not ready for Inspection |
IVRS - Inspection :*/ 1) FITTINGS TO BE PRIMED AND TAPED 2) AGA OR CSA APPROVED GAS VALVES TO ALL APPLIANCES 3) PROVIDE BONDING OF BLDG GAS PIPING 4) VENT FROM WATER HEATER TO BE SECURED WITH 3-GALV SCREWS PER JOINT AND TERMINATED WITH AN APPROVED CAP 5) VENT FROM HEATER WHEN WITHIN 10' OF COOLER INTAKE TO BE 12' ABOVE TOP OF COOLER 6) T & P TO GRAVITY DRAIN TO DAYLIGHT |