Inspection History Details
Inspection Status: Denied
Inspection History: PLUMBING - GAS PRESS TEST FNL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/04/2004 | PLUMBING - GAS PRESS TEST FNL | Denied | IVRS - Inspection : See detailed listing on site.| 999*/ 1) SHALL BOND GAS LINE WITH #6 WIRE MINIMUM 2) SHALL SEAL ROOF FLASHING WITH APPROVED PLASTIC CEMENT |
|
| 08/04/2004 | PLUMBING - GAS PRESS TEST FNL | Approved | IVRS - Inspection :*/ 1) GAS PRESSURE TEST IS OK 2) GAS SHUT OFF VALVES OK 3) WATER HEATER FLU VENT, T & P VALVE AND DRAIN IS OK 4) NOTE: HAVE PLBG CONTRACTOR CONNECT BONDING TO THE WATER LINE THEN AT GAS LINE |