Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/10/2004 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :*/ 1) CORRECTIONS MADE 2) 11 PSI AIR TEST NEW 3/4" SCOTCH COAT UNDERGROUND TO BDLG UP TO ROOF TO STOVE, WATER HEATER AND FURNACE OK 2) GAS CARD AT METER | |
| 08/06/2004 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999*/ 1) PROVIDE BONDING ON BLDG GAS PIPING 2) WATER HEATER TEMPERATURE AND RELIEF DRAIN TO BE FULL SIZE 3/4" PIPING AND TERMINATE WITH 90 DEGREE DOWN 3) NO UNIONS SHALL BE USED IN LINE PIPING SEE NOTE #7 FROMN 7/28/04 INSPECTION. RETEST AND CALL BACK IN 4) INSTALL LOWER COMBUSTION AIR IN DOOR OF WATER HEATER CLOSET 5) ROOF FLASHINGS ARE REQUIRED AT ROOF PENETRATIONS |
|
| 07/28/2004 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999*/ 1) 10 PSI MINIMUM PRESSURE TEST TO HOLD FOR 15 MINUTES AT TIME OF INSPECTION 2) PIPING CANNOT BE RAN UNDERGROUND UNDER A BLDG STRUCTURE OR BREEZE WAY 3) UNDERGROUND PIPING TO HAVE 12" MINIMUM COVER 4) ALL GAS APPLIANCES TO HAVE AGA OR CSA GAS VALVES 5) PROVIDE BONDING OF BLDG GAS PIPING 6) WATER HEATER T & P TO GRAVITY DRAIN TO DAYLIGHT AND 90 DEGREE DOWN 7) WHERE UNIONS ARE NECESSARY RIGHT-LEFT NIPPLES AND COUPLINGS SHALL BE USED 8) WHEN VENT FROM WATER HEATER/FURNACE IS WITHIN 10' OF COOLER INTAKE IT SHALL BE 3' ABOVE TOP OF COOLER |