Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/02/2004 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 07/27/2004 | PLUMBING - FINAL | Denied | IVRS - Inspection :DENIED. (1) ALL ABOVE GROUND GAS PIPING TO BE SUPPORTED PROPERLY, 6" MINIMUM ABOVE FINISH GRADE AND APPROVED COUPLINGS SHALL BE USED. (2) WATER HEATER TEMPERATURE AND PRESSURE RELIEF TO BE APPROVED MATERIALS FOR DRAIN, CPVC, COPPER, CALU PIPE AND TERMINATE AT 90 DEGREE DOWN AND BE SUPPORTED PROPERLY, GRAVITY DRIAN TO DAYLIGHT. (3) BLD GAS PIPING TO BE BONDED TO COLD WATER PIPING WITH BONDING CLAMPS AND #4 COPPER WIRE. (4) VENT FROM WATER HEATER AND FURNACE WHEN WITHIN 10' OF COOLER INTAKE TO BE 3' ABOVE TOP OF COOLER SECURITIED PROPERLY WITH APPROVED VENT CAP. See detailed listing on site.| 999* |