Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESS TEST FNL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/02/2004 | PLUMBING - GAS PRESS TEST FNL | Approved | IVRS - Inspection :* | |
| 07/27/2004 | PLUMBING - GAS PRESS TEST FNL | Denied | IVRS - Inspection :DENIED. (1) ALL ABOVE GROUND GAS PIPING TO BE SUPPORTED PROPERLY, 6" MINIMUM ABOVE FINISH GRADE, AND APPROVED COUPLINGS SHALL BE USED. (2) WATER HEATER TEMPERTURE & PRESSURE RELIEF TO BE APPROVED MATERIALS FOR DRAIN, CPVC, COPPER GALV PIPE AND TERMINATE(?) AT 90 DEGREE DOWN AND BE SUPPORTED PROPERLY, GRAVITY DRAIN TO DAYLIGHT. (3) BLD GAS PIPING TO BE BONDED TO COLD WATER PIPING WITH BONDING CLAMPS AND #4 COPPER WIRE. (4) VENT FROM WATER HEATER AND FURNACE WHEN WITHIN 10' OF COOLOR INTAKE TO BE 3' ABOVE TOP OF COOLOR SECURED PROPERLY WITH APPROVED VENT CAP. See detailed listing on site.| 999* |