Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/02/2004 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 07/27/2004 | PLUMBING - FINAL | Denied | IVRS - Inspection :DENIED. (1) INSTALL YOUR BONDING CLAMP ON BLD. GAS PIPING. (2) SEAL PONOTRATIONS INTO BUILDING. (3) WATER HEATER T & P TO TORMINATE 6" TO 24" ABOVE GRADE. | |
| 07/22/2004 | PLUMBING - FINAL | Denied | IVRS - Inspection :SHALL PROVIDE 3 SHEET METAL SCREWS PER JOINT @ APPLIANCE COLLAR AND ALL FLU VENT JOINTS GAS LINE SUPPLY TO WATER HTR & FURNACE REQUIRES A STRAP. SOMEONE COULD STEP ON THIS LINE AND BREAK THE JOINT SEAL T&P DRAIN APPEARS TO HAVE BACK PITCH SHALL USE REQUIRED TEST GAGE FOR PRESSURE TEST |
|
| 07/12/2004 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999*/ 1) ALL GAS PIPING ABOVE GRADE SHALL BE MINIMUM 6" ABOVE FINISH GRADE 2) ALL PIPING SHALL BE ARRANGED SO EQUIPMENT CAN BE SERVICED 3) PROVIDE BONDING OF BLDG GAS PIPING 4) WATER HEATER T & P TO GRAVITY DRAIN TO DAYLIGHT |