Permit: T04PL01178

Parcel: 135104050


Addresses:

7460 E 30TH ST

Inspection Status: Approved

Inspection History: PLUMBING - GAS PRESSURE TEST

Date Description Inspector Results Comments
09/28/2004 PLUMBING - GAS PRESSURE TEST Approved IVRS - Inspection :*
08/06/2004 PLUMBING - GAS PRESSURE TEST Denied IVRS - Inspection :
See detailed listing on site.| 999*/ 1) UNDERGROUND GAS PIPING TO BE SCOTCH COAT WITH 12" MINIMUIM COVER OR ABOVE GROUND PIPING TO BE 6" ABOVE GRADE 2) ROOF FLASHING IS REQUIRED AT ROOF PENETRATIONS 3) HAVE WATER HEATER ADDED TO YOUR PERMIT 4) PROVIDE BONDING OF BLDG GAS PIPING 5) INSTALL UPPER AND LOWER COMBUSTION AIR FOR WATER HEATER AND FURNACE 6) PROVIDE WATER HEATER TEMP AND PRESSURE RELIEF. GRAVITY DRAIN TO DAYLIGHT WITH APPROVED PIPING OR OBTAIN PETITION OF APPEAL FOR ALTERNATE FORM OF T & P RELIEF ON SITE, SIGNED BY CITY WITH PROPER INSTALLATION. THIS MAY NOT BE A COMPLETE LIST