Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date |
Description |
Inspector |
Results |
Comments |
| 06/04/2004 |
PLUMBING - GAS PRESSURE TEST |
|
Approved |
IVRS - Inspection :* |
| 06/02/2004 |
PLUMBING - GAS PRESSURE TEST |
|
Not ready for Inspection |
IVRS - Inspection :*/ 1) NO UNIONS ON IN LINE PIPING. 2) VENT FROM WTR HTR TO BE PROPERLY SECURED TO DRAFT HOOD WITH 3 GALV. SCREWS AT EACH JOINT. 3) PROVIDE BONDING OF BLD GAS PIPING. 4) WTR HTR T&P RELIEF TO GRAVITY DRAIN TO DAYLIGHT AND 90 DOWNWARD OR PROVIDE CITY SIGNED PETITION OF APPEAL WITH INSTALLATION OF ALTERNATE FORM OF T&P RELIEF ON SITE. 5) VENTS FROM WTR HTR AND FURNACE WITHIN 10' OF COOLER INTAKE TO BE 3' ABOVE TOP OF COOLER SECURED WITH APPROVED CAPS. 6) ALL PIPING TO BE SECURED WITH 2-HOLE STRAPS OR APPROVED METHOD ESPECIALLY IN WTR HTR CLOSET. RETEST TO 10 PSI MIN. WITH CORRECTIONS FOR NEXT INSP. |