Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 06/02/2004 |
PLUMBING - FINAL |
|
Approved |
IVRS - Inspection :*/ 15 PSI AIR TEST FROM METER TO 6 ROOF TOP UNITS APPROVED - CORRECTION MADE. GAS CARD AT METER. 889-1888. CONTRACTOR TO SEAL PENETRATION AT WEST SIDE OF BLD WHERE 2" GAS GOES INTO BLD. |
| 05/21/2004 |
PLUMBING - FINAL |
|
Not ready for Inspection |
IVRS - Inspection :*/ 1) 10 PSI MINIMUM TEST PRESURE AT TIME OF INSPECTION 2) PROVIDE BONDING OF BLDG GAS PIPING 3) PROVIDE ACCESS TO ROOF TOP UNITS 4) COMMERCIAL BLSGS REQUIRE CITY APPROVED ISOMETRIC DRAWINGS |