Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: T04PL00914

Parcel: 13342001C


Addresses:

6790 E CALLE LA PAZ

Inspection Status: Approved

Inspection History: PLUMBING - PROGRESS

Date Description Inspector Results Comments
01/21/2005 PLUMBING - PROGRESS Approved TEST OK VACUUM TEST OK ON M-H #17
01/20/2005 PLUMBING - PROGRESS Partial Approval IVRS - Inspection :* NOT READY FOR INSPECTION
01/19/2005 PLUMBING - PROGRESS Partial Approval IVRS - Inspection :* MANHOLE # 15 VACUUM TEST OK. MANHOLE #16 VACUUM TEST OK. BUILDING #3, 2-4 " HCS CONNECTIONS OK
01/14/2005 PLUMBING - PROGRESS Partial Approval IVRS - Inspection :*/TEST FROM M-H #15 TO BLDG #16 OK. TEST FROM MH #15 - MH #16 8" OK. TEST FROM MH #17 TO BLDG #21 OK. TEST FROM MH #16 TO BLDG #19 OK. PUBLIC MHY #9 TO BLDG 20. PLEASE PROVIDE REVISION ON PLAN TO DELITE DIP. RELOCATE HCS FOR BLD #16 &21. DIP HAS NOT BEEN INSTALLED. PLEASE NOTE WILL NEED VARIFICATION OF GRADE VACUUM TEST ON ALL MANHOLES & CERTIFICATE OF COMPLETION FROM PCWW DEPT OF ENVIRONMENTAL QUALITY
01/13/2005 PLUMBING - PROGRESS Partial Approval IVRS - Inspection :*PARTIAL
12/21/2004 PLUMBING - PROGRESS Partial Approval IVRS - Inspection :*/COMPLETE FORM M-H #15, 16, 17 OK SUBJECT TO APPROVED REVISED PLAN. VARIFICATION OF GRADE & TESTING-VACUUM TEST ON M-H
12/20/2004 PLUMBING - PROGRESS Partial Approval IVRS - Inspection :*/M-H #16 #17 #15 M ALSO HCS FOR BLD #2 #4 #6 SUBJECT TO APPROVED REVISED PLAN. RED LINE ON JOB
10/12/2004 PLUMBING - PROGRESS Partial Approval IVRS - Inspection :*/6" SEWER FROM MANHOLE #5 TO 6" STUB UP AT BLD #3 ABOUT 5' FROM BLD 2WAY CLEANOUT 6PSI AIR TEST OK. 1)WILL NEED TO SEE HCS CONNECTION.
10/11/2004 PLUMBING - PROGRESS Not ready for Inspection IVRS - Inspection :*
10/11/2004 PLUMBING - PROGRESS Partial Approval IVRS - Inspection :*/6" SEWER FROM NEW PUBLIC MANHOLE #1 TO BLD #8 6PSI AIR TEST TO WITHIN 10' OF 2-WAY CLEANOUT 1)NEED TO VIEW HCS CONNECTIONS 12" SEWER FROM MANHOLE #1 TO MANHOLE #2 INCLUDING (2) 4" HCS CATERALS? FOR BLD 7 TO WITHIN 5' OF BLD 2-WAY CLEANOUT 6PSI AIR TEST OK 1)NEED TO VIEW HCS CONNECTION
10/07/2004 PLUMBING - PROGRESS Partial Approval IVRS - Inspection :*/AIR TEST BETWEEN MANHOLES #3 & #4 WITH BRANCHES TO WITHIN FIVE FEET OF BLDG OK. NEED TO SEE FINAL CONNECTIONS AT BLDG DRAIN/BLDG SEWER
09/24/2004 PLUMBING - PROGRESS Partial Approval IVRS - Inspection :*1)8" SEWER FROM MANHOLE #12 TO #13 WITH (2) 4" LATERALS STUBBED UP AT BLD 14 5PSI AIR TEST OK 2)6" SEWER FROM MANHOLE #13 TO STUB UP AT BLD 15 5PSI AIRTEST OK 3) 8" SEWER FORM MANHOLE #13 TO #14 5PSI AIR TEST OK. 4)6" SEWER FROM MANHOLE #14 TO STUB UP AT BLD 1 5PSI AIR TEST OK 5)4" SEWER FROM MANHOLE #24 TO STUB UP AT REC BLD 5PSI AIR TEST OK 6)8" SEWER FROM EXISTING MANHOLE IN CAMINO SORINA TO MANHOLE #10 5PSI AIR TEST OK 7)8" SEWER FROM MANHOLE #10 TO #11 INCLUDING 2-4" STUB UP AT BLD 9, 2-4" STUB UPS AT BLD 13, 2-4" STUB UPS AT BLD 10 AND 2-4" STUB UPS AT BLD 12 5PSI AIRTEST OK. 8)6" SEWER FROM MANHOLE #11 TO STUB UP AT BLD 11 5PSI AIR TEST OK 9)6" SEWER FROM MANHOLE #11 TO STUB UP AT BLD 2 5PSI AIR TEST OK
09/13/2004 PLUMBING - PROGRESS Partial Approval IVRS - Inspection :*/M-H #12 VACCUM TEST OK,
M-H #13 TEST OK, M-H #14 TEST OK
09/09/2004 PLUMBING - PROGRESS Partial Approval IVRS - Inspection :*/M-H #11 VACUUM TEST OK
09/08/2004 PLUMBING - PROGRESS Partial Approval IVRS - Inspection :*/VACUUM TEST ON M-H #10=OK
VACUUM TEST ON M-H #11=NOT READY
09/02/2004 PLUMBING - PROGRESS Not ready for Inspection IVRS - Inspection :*
08/26/2004 PLUMBING - PROGRESS Partial Approval IVRS - Inspection :*/NR NOTE: DO WE HAVE A PERMIT TO 6795
08/24/2004 PLUMBING - PROGRESS Not ready for Inspection IVRS - Inspection :*/PARTIAL-2-4" SEWERS STUBBED TO 6' FROM BLDG 13 FROM 8" SEWER BETWEEN NAMHOLE #10 & #11. AIR TEST AT LATER DATE
08/24/2004 PLUMBING - PROGRESS Partial Approval IVRS - Inspection :*/ 1) FROM M-H #11 TO BLDG #2-? #11 PLEASE PROVIDE LETTER ON DIP-FOR ABOVE HCS
08/23/2004 PLUMBING - PROGRESS Partial Approval IVRS - Inspection :*/NR
08/20/2004 PLUMBING - PROGRESS Partial Approval IVRS - Inspection :*/PA-1)HCS FROM M-H #11 TO BLDG 11 -OK 2)HCS TO BLDG #9 -K 3)PLEASE PROVIDE LETTER ON DIP-HAS NOT BEEN INSTALLED ON HCS FOR BLDG 12 & 11 4)PLEASE PROVIDE STAMP BY ENGINEER OF RECORD ON HIS LETTER HEAD-WITH SEWER PERMIT #.
08/18/2004 PLUMBING - PROGRESS Partial Approval IVRS - Inspection :*/ 1) FROM M-H #10 TO #11 OK 2) OK TO BACKFILL 3) CONTRACTOR WILL TEST AT LATER DATE VERIFICATION OF GRADE AND VACCUM TEST ON MANHOLES
08/17/2004 PLUMBING - PROGRESS Partial Approval IVRS - Inspection :*/ 1) APPROX 80' EAST OF M-H #10 2) WILL REQUIRE VERIFICATION OF GRADE AND VACCUM TEST ON MAIN HOLES
08/16/2004 PLUMBING - PROGRESS Partial Approval IVRS - Inspection :*/ 1) FROM M-H #10 PROPERTY LINE ONLY 2) OK TO COVER
08/09/2004 PLUMBING - PROGRESS Partial Approval IVRS - Inspection :*/ 1) FROM M-H #12 #13 TO 14 AN HCS TO BLDG. CONTRACTOR WILL TEST AT LATER DATE PLEASE PROVIDE VERIFICATION OF GRADE AND VACCUM TEST ON M-H AT LATER DATE. ALSO M-H #5 HCS TO BLDG #3 OK TO BACKFILL