Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 06/16/2004 |
PLUMBING - FINAL |
|
Approved |
|
| 05/21/2004 |
PLUMBING - FINAL |
|
Not ready for Inspection |
1) GAS PRESSURE TEST FOR 1" U.G. SUPPLY TO TRAILER STUB UP IS OK. 2) OK TO BACKFILL TRENCH. 3) NOTE: I MUST HAVE ACCESS TO ALL GAS APPLIANCES INSIDE. 4) NOTE: MUST EXTEND T&P DRAIN AND SCREW DOWN WTR HTR FLU VENT AT APPLIANCE COLLAR. 5) CONNECT TO EXISTING GAS SYSTEM AND PROVIDE AIR TEST AT TIME OF FINAL INSPECTION. |