Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Not ready for Inspection
Inspection History: PLUMBING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 05/21/2004 |
PLUMBING - FINAL |
|
Not ready for Inspection |
IVRS - Inspection :*/ 1) A 15 PSI PRESSURE TEST MUST BE DONE ON ENTIRE LINE A) HOOK UP GAUGE AT TOP OF RISER B) SHUT OFF VALVES AT FURNACE, BOILER AND STOVE C) PUMP UP WITH BIKE PUMP TO 15 PSI 2) ALL UNDERGROUND PIPE MUST BE WRAPPED FROM 6" ABOVE GRADE TO 6" ONTO GREEN PIPE USE 30 ML. PVC TAPE OR SPIRAL WRAP 3 LAYERS OF 10 EL TAPE |
| 05/21/2004 |
PLUMBING - FINAL |
|
Approved |
IVRS - Inspection :*/ 1) SWG CITY OF TUCSON HAS APPROVED GAS RECONNECT-I AM OUT OF BLUE STICKERS |