Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date |
Description |
Inspector |
Results |
Comments |
| 05/17/2004 |
PLUMBING - GAS PRESSURE TEST |
|
Approved |
IVRS - Inspection :* |
| 05/14/2004 |
PLUMBING - GAS PRESSURE TEST |
|
Partial Approval |
IVRS - Inspection :*/ 13 PSI TEST FROM METER TO STOVE, WTR HTR, FURNACE OK. 1) PROVIDE PROPER BONDING OF BLD GAS PIPING. 2) SECURE ALL PIPING PROPERLY. 3) WTR HTR T&P TO BE RIDGID PIPING GRAVITY DRAIN TO DAYLIGHT. 4) VENTS FROM COMBUSTABLE APPLIANCES WITHIN 10' OF COOLER INTAKE TO BE 2' ABOVE. 5) SEAL ALL PENETRATIONS INTO BLD FROM PIPING. |