Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
The login landing page when selecting 'View' is still occurring and is still pending further investigation.
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date |
Description |
Inspector |
Results |
Comments |
| 05/18/2004 |
PLUMBING - GAS PRESSURE TEST |
|
Approved |
IVRS - Inspection :* |
| 05/14/2004 |
PLUMBING - GAS PRESSURE TEST |
|
Partial Approval |
IVRS - Inspection :* |
| 05/12/2004 |
PLUMBING - GAS PRESSURE TEST |
|
Not ready for Inspection |
IVRS - Inspection :*/ 1) GAS SYSTEM SHALL HAVE MIN. 10 PSI TEST FOR 15 MINUTES AT TIME OF INSP. 2) WHERE UNIONS ARE NECESSARY, LEFT-RIGHT NIPPLES AND UNIONS SHALL BE USED. 3) PROVIDE PROPER BONDING OF BLD GAS PIPING. 4) PENETRATIONS THRU ROOF REQUIRE ROOF FLASHINGS. 5) VENTS FROM WTR HTR AND FURNACE TO HAVE APPROVED VENT MATERIALS AND WHEN WITHIN 10' OF COOLER INTAKE TO BE 3' ABOVE COOLER WITH APPROVED CAPS. 6) SUPPORT PIPING IN WTR HTR CLOSET. 7) WTR HTR CLOSET REQUIRES MIN. 10"X10" OR 100" SQ. INCHES OF LOWER COMBUSTION AIR INTAKE WITHIN 12" OF FLOOR. THIS MAY NOT BE A COMPLETE LIST. |