Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Not ready for Inspection
Inspection History: PLUMBING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 05/14/2004 |
PLUMBING - FINAL |
|
Not ready for Inspection |
IVRS - Inspection :*/ 20 PSI AIR TEST FROM METER NEW 3/4" ABOVE GRADE TO WTR HTR AND FURNACE APPROVED. PROVIDE PROPER BONDING OF BLD GAS PIPING. GAS CARD AT METER 889-1888. |
| 05/13/2004 |
PLUMBING - FINAL |
|
Not ready for Inspection |
IVRS - Inspection :*/ 1) 10 PSI MIN. PRESSURE TEST ON SYSTEM AT TIME OF INSP. 2) APPROVED AGA OR CSA VALVES AT ALL APPLIANCES. 3) PROVIDE PROPER BONDING OF BLD GAS PIPING. 4) VENTS FROM WTR HTR AND FURNACE TO BE 3' ABOVE TOP OF COOLER WHEN WITHIN 10' OF COOLER INTAKE. THIS MAY NOT BE A COMPLETE LIST. |