Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/04/2004 | PLUMBING - FINAL | Approved | IVRS - Inspection :*/ 20 PSI AIR TEST FROM METER NEW 1½ TO POOL HTR, WTR HTR, 2 STOVES, 2 WALL HTRS, DRYER AND ROFF TOP UNIT ONLY. FIREPLACE HAS BEEN DISCONNECTED AND CAPPED IN CEILING. APPROVED CORRECTION MADE, GAS CARD AT METER. 889-1888. | |
| 06/01/2004 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999*/ CONTRACTOR TO PAY RE-FEE BEFORE NEXT INSP. 0 PSI ON GUAGE AT TIME OF TEST. |
|
| 05/19/2004 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :*/ 1) PROVIDE FLASHING AT ALL ROOF PENETRATIONS. RETEST AND CALL IN WITH PRESSURE TEST 10 PSI MIN. IN PLACE. | |
| 05/13/2004 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999*/ 10 PSI MIN. ON AIR TEST AT TIME OF INSP. GAUGE AT '0'. CONTRACTOR TO PAY RE-FEE BEFORE NEXT INSP. |
|
| 05/12/2004 | PLUMBING - FINAL | Cancelled | IVRS - Ri canceled | |
| 05/12/2004 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* | |
| 05/10/2004 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999*/ 1) NO ONE ON SITE |
|
| 05/10/2004 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :*/ 1) PROVIDE ROOF FLASHING ON ALL PIPE PENETRATIONS THRU ROOF. 2) SUPPORT 1½ PIPING AT DROP TO METER. 3) PROVIDE APPROVED GAS VALVE AT POOL EQUIPMENT, RETEST AND CALL IN. | |
| 05/07/2004 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999*/ 1) MUST PROVIDE AIRE TEST ON SYSTEM. TEST GAUGE WAS AT 0 POUNDS, 10 POUNDS MINIMUM REQUIRED |
|
| 05/04/2004 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* |