Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Not ready for Inspection
Inspection History: PLUMBING - GAS PRESSURE TEST
Permit Number - T04PL00802
Inspection Description - PLUMBING - GAS PRESSURE TEST
Inspection Status - Not ready for Inspection
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/13/2004 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* | |
05/12/2004 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :*/ 1) WHEN A RISER CONNECTS TO UNDERGROUND PLASTIC PIPE THE UNDERGROUND HORIZONTAL METALIC PORTION OF THE RISER SHALL EXTEND AT LEAST 30" BEFORE CONNECTION TO PLASTIC PIPE. 2) HAVE YOUR LIC. PLBG CONTRACTOR ON THIS JOB SITE AT TIME OF NEXT INSP. | |
05/10/2004 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :*/ 1) PROVIDE PRE FABRICATED GAS RISER OR SCOTCH COAT PIPING PRIMED AND TAPED FOR UNDERGROUND PIPING. 2) EXPOSE ALL PIPING. 3) 3/4" PIPING SHALL BE ALL THE WAY TO METER. 4) HAVE YOUR COPY OF YOUR COMMERCIAL PLBG LICENSE WITH SOMEONE PRESENT AT SITE FOR NEXT INSP. | |
05/06/2004 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999*/ 100 LB. TEST GUAGE NOT ACCEPTABLE. GUAGE MUST BE IN 1/10TH INCREMENTS. REMOVE UNION FROM GAS LINE. DO NOT TAPE MORE THAN 18" TOTAL ON GAS LINE. 12" UNDERGROUND AND 6" ABOVE GROUND. MUST USE APPROVED TAPE PRIMER ON TAPED PIPE. |