Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: T04PL00802

Parcel: 141306120

Inspection Status: Not ready for Inspection

Inspection History: PLUMBING - GAS PRESSURE TEST

Permit Number - T04PL00802

Inspection Description - PLUMBING - GAS PRESSURE TEST

Inspection Status - Not ready for Inspection

Date Description Inspector Results Comments
05/13/2004 PLUMBING - GAS PRESSURE TEST Not ready for Inspection IVRS - Inspection :*
05/12/2004 PLUMBING - GAS PRESSURE TEST Not ready for Inspection IVRS - Inspection :*/ 1) WHEN A RISER CONNECTS TO UNDERGROUND PLASTIC PIPE THE UNDERGROUND HORIZONTAL METALIC PORTION OF THE RISER SHALL EXTEND AT LEAST 30" BEFORE CONNECTION TO PLASTIC PIPE. 2) HAVE YOUR LIC. PLBG CONTRACTOR ON THIS JOB SITE AT TIME OF NEXT INSP.
05/10/2004 PLUMBING - GAS PRESSURE TEST Not ready for Inspection IVRS - Inspection :*/ 1) PROVIDE PRE FABRICATED GAS RISER OR SCOTCH COAT PIPING PRIMED AND TAPED FOR UNDERGROUND PIPING. 2) EXPOSE ALL PIPING. 3) 3/4" PIPING SHALL BE ALL THE WAY TO METER. 4) HAVE YOUR COPY OF YOUR COMMERCIAL PLBG LICENSE WITH SOMEONE PRESENT AT SITE FOR NEXT INSP.
05/06/2004 PLUMBING - GAS PRESSURE TEST Denied IVRS - Inspection :
See detailed listing on site.| 999*/ 100 LB. TEST GUAGE NOT ACCEPTABLE. GUAGE MUST BE IN 1/10TH INCREMENTS. REMOVE UNION FROM GAS LINE. DO NOT TAPE MORE THAN 18" TOTAL ON GAS LINE. 12" UNDERGROUND AND 6" ABOVE GROUND. MUST USE APPROVED TAPE PRIMER ON TAPED PIPE.