Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/13/2004 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* | |
| 05/07/2004 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999*/ 1) MUS SCREW DOWN WATER HEATER FLU VENT WITH (3) SHEET METAL SCREWS PER JOINT AND AT APPLIANCE COLLAR 2) MUST HARD PIPE 1/2" GAS SUPPLY THRU HOUSING OF FURNACE THEN CONNECT THE FLEX CONNECTOR |
|
| 04/30/2004 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :*/ 1) GAS PIPING IN WATER HEATER AND FURANCE AREA TO BE SECURED PROPERLY 2) PROVIDE BONDING OF BLDG GAS PIPING 3) PROVIDE AGA OR CSA APPROVED GAS VALVE AT STOVE. RETEST GAS SYSTEM FOR TIME OF NEXT INSPECTION |