Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 05/25/2004 |
PLUMBING - FINAL |
|
Approved |
IVRS - Inspection :*/ 15 PSI AIR TEST FROM METER NEW 1" SCOTCH COAT TO EXISTING BLD CONNECTION PRESSURE TEST THRU TO WTR HTR, 2 WALL HTRS, AND STOVE OK. CORRECTION MADE. |
| 05/05/2004 |
PLUMBING - FINAL |
|
Not ready for Inspection |
IVRS - Inspection :*/ 1) EXTERIOR PIPING UNDERGROUND TO BE SCOTCH COAT AND PRIMED AND TAPED AT TOOL MARKS AND FITTINGS. 2) WHERE UNIONS ARE NECESSARY RIGHT/LEFT NIPPLE AND COUPLINGS SHALL BE USED. 3) USE APPROVED FITTINGS AT ALL JOINT LOCATIONS. 4) ALL PIPING ABOVE GROUND TO BE 6" MIN. ABOVE FINISHED GRADE. 5) T&P DRAIN TO BE HARD PIPED. 6) ALL VENT FROM GAS APPLIANCES WITHIN 10' OF COOLER INTAKE TO BE 3' ABOVE TOP OF COOLER. |