Inspection Status: Not ready for Inspection
Inspection History: PLUMBING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 05/21/2004 |
PLUMBING - FINAL |
|
Not ready for Inspection |
IVRS - Inspection :*/ 1) 3/4" SCOTCH COAT UNDERGROUND FROM METER TO WATER HEATER 2) WALL HEATERS AND STOVE 14 PSI AIR TEST OK 3) PROVIDE #4 COPPER WIRE FOE BONDING 4) CALL BACK FOR FINAL |
| 05/19/2004 |
PLUMBING - FINAL |
|
Not ready for Inspection |
IVRS - Inspection :*/ 1) SEE NOTE 5 AND 8 FROM PREVIOUS INSP. - HAVE WTR HTR ADDED TO YOUR PERMIT. RETEST AND CALL IN. 2) PROVIDE GALV. 90o NOT BLK I.P. FOR WTR HTR PIPING. |
| 05/18/2004 |
PLUMBING - FINAL |
|
Not ready for Inspection |
IVRS - Inspection :*/ SEE NOTE 5, 8, AND 9 FROM PREVIOUS INSP. HAVE WTR HTR ADDED TO YOUR PERMIT. |
| 05/12/2004 |
PLUMBING - FINAL |
|
Not ready for Inspection |
IVRS - Inspection :*/ CANCELLED PER CUSTOMER. |
| 04/27/2004 |
PLUMBING - FINAL |
|
Not ready for Inspection |
IVRS - Inspection :*/ 1) 10 PSI MIN. PRESSURE TEST AT TIME OF INSP. 2) USE APPROVED FITTINGS AT ALL PIPE CONNECTIONS. 3) WHERE UNIONS ARE REQUIRED LEFT/RIGHT NIPPLES AND COUPLINGS SHALL BE USED. 4) USE FITTINGS TO MAKE CHANGE OF DIRECTION. 5) AGA OR CSA APPROVED VALVES AT ALL LOCATIONS. 6) PRIME AND TAPE ALL UNDERGROUND FITTINGS AND TOOL MARKS ON PIPING. 7) ALL VENTS FROM FURNACES OR WTR HTR WITHIN 10' OF COLLER INTAKE TO BE 3' ABOVE TOP OF COOLER WITH APPROVED CAP. 8) PROPER BONDING OF GAS PIPING IS REQUIRED. 9) WTR HTR T&P RELIEF TO GRAVITY DRAIN TO DAYLIGHT WITH APPROVED FULL SIZE PIPING MATERIALS. THIS MAY NOT BE A COMPLETE LIST. |