Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 06/15/2004 |
PLUMBING - FINAL |
|
Approved |
IVRS - Inspection :*/ 12 PSI AIR TEST FROM METER NEW 1" P.E. LINE TO BLD AND 1" TIE INTO WTR HTR AND FURNACE APPROVED. PETITION OF APPEAL FOR ALTERNATE FORM OF T&P #79 ON SITE. GAS CARD AT METER. CORRECTION MADE. |
| 06/11/2004 |
PLUMBING - FINAL |
|
Not ready for Inspection |
IVRS - Inspection :*/ 1) GAS HAS BEEN TURNED BACK ON PRIOR TO INSPECTION 2) PROVIDE OR HAVE WATER HEATER ADDED TO YOUR PERMIT 3) FLUE FROM FURNACE MUST BE CORRECTLY ATTACHED 4) WATER HEATER TEMP/PRESS RELIEF DRAIN PIPING SHALL BE FULL SIZE GRAVITY DRAIN TO DAYLIGHT WITH APPROVED RIDGID PIPING OR PROVIDE PETITION OF APPEAL SIGNED BY CITY WITH PROPER INSTALLATION 5) 10 PSI TEST SHALL BE ON SYSTEM AT TIME OF INSPECTION 6) PLASTIC PIPING SHALL HAVE MINIMUM 18", COVER ALL AREAS 7) EXPOSE ALL FITTINGS ON PLASTIC PIPING 8) PROVIDE BONDING OF BLDG GAS PIPING 9) VENTS FROM WATER HEATER AND FURNACE WITHIN 10' OF COOLER INTAKE TO BE 3' ABOVE TOP OF COOLER 10) THIS MAY NOT BE A COMPLETE LIST |