Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/11/2004 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :*/ 1) 15 PSI AIR TEST FROM METER NOW 3/4" ABOVE GROUND TO WATER HEATER, DRYER, STOVE (ONLY) OK. CORRECTION MADE. GAS CARD AT METER | |
| 06/07/2004 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999*/ SYSTEM SHALL HOLD PREESURE. |
|
| 06/04/2004 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :*/ 10 PSI TEST MUST HOLD TIGHT FOR MINIMUM 15 MINUTES. 1) PROVIDE GALV. NIPPLE AT OLD WTR HTR LOCATION ON H20 PIPING. 2) APPROVED VENT CAP FOR WTR HTR TO BE INSTALLED ON VENT. | |
| 04/30/2004 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* | |
| 04/28/2004 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :*/ 1) PROVIDE GAS VALVE FOR WATER HEATER IN ACCESSIBLE LOCATION 2) SECURE ALL GAS PIPING PROPERLY 3) PROVIDE T & P DRAIN WITH APPROVED DRAINAGE MATERIAL | |
| 04/14/2004 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection 0000*/ 1) 10 PSI PRESSURE TEST ENTIRE SYSTEM AT TIME OF INSP. 2) AGA OR CSA APPROVED GAS VALVES AT ALL APPLIANCES. 3) WTR HTR TO BE INSTALLED WITH CORRCT VENTING AND T&P TO GRAVITY DRAIN TO DAYLIGHT OR PROVIDE PETITION OF APPEAL FOR ALTERNATE FORM OF T&P RELIEF ON SITE WITH PROPER INSTALLATION. 4) PROVIDE PROPER BONDING OF BLD GAS PIPING. 5) SECURE ALL PIPING WITH APPROVED CLAMPS. |