Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 04/21/2004 |
PLUMBING - FINAL |
|
Approved |
1) GAS PRESSURE TEST IS OK. 2) GAS SHUT OFF VALVES OK. 3) WTR HTR FLU VENT T&P VALVE AND DRAIN IS OK. |
| 04/14/2004 |
PLUMBING - FINAL |
|
Denied |
IVRS - Inspection 0999*/ 1) MUST PROVIDE AIR PRESSURE TEST ON ENTIRE SYSTEM 10 LBS MIN. 2) MUST REMOVE UNION IN LINE AND REPLACE WITH RIGHT LEFT HAND NIPPLE. 3) MUST PROVIDE 3/4" T&P DRAIN TO DAYLIGHT TERMINATE 6" ABOVE GROUND. 4) MUST SCREW DOWN WTR HTR FLU VENT WITH THREE SHEET METAL SCREWS PER JOINT. 5) MUST REMOVE ASBESTOES WTR HTR FLU VENT AND REPLACE WITH DBL WALL FLU VENT THRU CEILING THEN CONNECT SINGLE WALL TO DBL WALL. 6) MUST REPLACE ALL GAS SHUT OFF VALVES WITH AGA OR CSA VALVES. 7) GAS LINE THAT RUNS INTO BASEMENT MUST BE MIN. 6" ABOVE GROUND. |