Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date |
Description |
Inspector |
Results |
Comments |
| 08/17/2004 |
PLUMBING - GAS PRESSURE TEST |
|
Approved |
IVRS - Inspection :* |
| 06/11/2004 |
PLUMBING - GAS PRESSURE TEST |
|
Not ready for Inspection |
IVRS - Inspection :*/ 1) ALL APPLIANCES TO HAVE AGA OR CSA APPROVED GAS VALVES 2) STOVE GAS PIPING SHALL BE RIDGID PENETRATION THRU WALL OF CABINET 3) PROVIDE BONDING OF BLDG GAS PIPING 4) UNION IN LINE PIPING SHALL BE REPLACED WITH LEFT-RIGHT NIPPLE AND COUPLING 5) VENT FROM WATER HEATER WITHIN 10' OF COOLER INTAKE TO BE 3' ABOVE TOP OF COOLER 6) WATER HEATER TEMPERATURE AND PRESSURE RELIEF PIPING TO BE FULL SIZE RIDGID PIPE, GRAVITY DRAIN TO DAYLIGHT OR PROVIDE PETITION OF APPEAL (SIGNED) FROM CITY WITH CORRECT INSTALLATION 7) PLEASE PROVIDE WORKING 0-15 PSI GAUGE FOR PRESSURE TEST 8) THIS MAY NOT BE A COMPLETE LIST |