Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 04/16/2004 |
PLUMBING - FINAL |
|
Approved |
IVRS - Inspection 0000* |
| 04/06/2004 |
PLUMBING - FINAL |
|
Not ready for Inspection |
IVRS - Inspection 0000*/ 15 PSI PRESSURE TEST ON EXISTING PIPING FROM EXTERIOR AT METER TO WTR HTR AND STOVE, ONLY OK. 1) PROVIDE PROPER BONDING OF BLD GAS PIPING. 2) WTR HTR TO BE WEATHER PROOF ENCLOSURE. 3) WTR HTR TO BE ADDED TO PERMIT. 4) WTR HTR T& P TO HAVE RIDGID PIPING TO 6" A.F.F. |
| 03/29/2004 |
PLUMBING - FINAL |
|
Not ready for Inspection |
IVRS - Inspection 0000*/ 1) WHERE UNIONS ARE NEEDED LEFT/RIGHT NIPPLES AND COUPLINGS SHALL BE USED. 2) THREAD PROTECTORS ARE NOT APPROVED COUPLINGS. 3) HAVE GAS PLBG FIXTURES INSTALLED FOR FINAL. |