Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 07/19/2004 |
PLUMBING - FINAL |
|
Approved |
IVRS - Inspection :*/ 1) GAS PRESSURE TEST IS OK 2) ALL CORRECTIONS HAVE BEEN MADE |
| 04/30/2004 |
PLUMBING - FINAL |
|
Not ready for Inspection |
IVRS - Inspection :*/ 1) 25 PSI AIR PRESSURE TTEST FROM METER NEW BLKIP TO STOVE, WATER HEATER, AND WALL HEATER 2) SEE NOTE #3 ABOVE, AND PROVIDE PPROVED VENT CAP SECURED PROPERLY ON WATER HEATER FLUE VENT 3) RECONFIGURE HOT WATER PIPING SO TEMPERATURE AND PRESSURE RELIEF VALVE WILL EXTEND STRAIGHT DOWN INTO WATER HEATER TANK AT ELAST 2' AND RECONFIGURE T & P DRAIN PIPING TO GRAVITY DRAIN TO DAY LIGHT WITH APPROVED MATERIALS |
| 04/28/2004 |
PLUMBING - FINAL |
|
Not ready for Inspection |
IVRS - Inspection :*/ 1) PLEASE HAVE SOMEONE PRESENT TO PROVIDE ACCESS 9:33 AM |
| 03/26/2004 |
PLUMBING - FINAL |
|
Denied |
IVRS - Inspection 0999*/ 1) MUST PROVIDE ROOF FLASHINGS FOR ALL PENETRATIONS THRU ROOF AS WELL AS FOR WTR HTR FLU VENT. 2) MUST SEAL PENETRATIONS THRU WALLS. 3) WTR HTR T&P VALVE TEMP PROBE MUST EXTEND 2" INTO WTR HTR TANK. 4) MUST STRAP DOWN GAS LINE FOR RANGE DROP AND FOR WALL FURNACE SUPPLY IN CLOSET. |