Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 05/13/2004 |
PLUMBING - FINAL |
|
Approved |
IVRS - Inspection :*/ 11 PSI AIR TEST ON NEW 1" SCOTCH COAT UNDERGROUND TO EXISTING 3/4" AT BLD, TO WTR HTR AND STOVE ONLY OK. STUB AT FURNACE IS VALVED AND CAPPED AND FURNACE BURNER AND CONTROLS ARE REMOVED FROM HOUSING. OWNER SAYS FURNACE REPLACEMENT AT FUTURE DATE. GAS CARD AT MEATR, 889-1888. |
| 04/13/2004 |
PLUMBING - FINAL |
|
Not ready for Inspection |
IVRS - Inspection 0000*/ 1) ALL UNDERGROUND PIPING TO BE RE OR SCH COAT WITH PRIMED AND TAPED JOINTS. 2) ALL BLD GAS PIPING TO BE TIED IN AND MIN. 10 PSI TEST AT TIME OF INSP. 3) THREAD PROTECTORS ARE NOT APPROVED COUPLINGS. USE APPROVED FITTINGS ON GAS SYSTEM. 4) GAS PIPING IN WTR HTR CLOSET TO BE 6" MIN. ABOVE FLOOR LEVEL. 5) WTR HTR TEMP AND PRESSURE RELIEF TO GRAVITY DRAIN TO DAYLIGHT WITH APPROVED PIPING MATERIAL. 6) DRAFT HOOD AND VENT PIPING TO BE PROPERLY SECURED FOR WTR HTR AND FURNACE. 7) VENT FROM WTR HTR AND FURNACE WHEN WITHIN 10' OF COOLER INTAKE TO BE 3' ABOVE COOLER INTAKE. 8) PROVIDE PROPER BONDING OF BLD GAS PIPING. 9) PROVIDE APPROVED CSA OR AGA GAS VALVES AT ALL APPLIANCES. 10) PERMANENT CAP WYE FITTING ON FURNACE VENT. 11) RIDGID PIPE PENETRATION OF FURNACE APPLIANCE HOUSING. THIS MAY NOT BE A COMPLETE LIST. |