Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 03/25/2004 |
PLUMBING - FINAL |
|
Approved |
IVRS - Inspection 0000*/ 12 PSI AIR TEST FROM METER 3/4 PIPING TO WTR HTR, DRYER AND FURNACE APPROVED. CORRECTIONS MADE. GAS CARD AT METER. |
| 03/23/2004 |
PLUMBING - FINAL |
|
Not ready for Inspection |
IVRS - Inspection 0000*/ 1) GAS SYSTEM TO HAVE MIN. 10 PSI AT TIME OF INSPECTION. 2) PENETRATIONS THRU ROOF TO HAVE APPROVED FLASHINGS, DO NOT CUT THEM. 3) PIPING ON ROOF TO BE SUPPORTED AND SECURED EVERY 8'. 4) NO UNION SHALL BE USED IN LINE PIPING. WHERE UNIONS ARE NECESSARY USE RIGHT/LEFT NIPPLE AND COUPLINGS. 5) VENT FROM FURNACE WITHIN 10' OF COOLER INTAKE TO BE 3' ABOVE COLLER. 6) PROVIDE PROPER BONDING ON GAS PIPING. 7) PROVIDE APPROVED AGA OR CSA GAS VALVES AT ALL APPLIANCES. |