Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
Permit Number - T04PL00488
Inspection Description - PLUMBING - ROUGH, SOIL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/14/2005 | PLUMBING - ROUGH, SOIL | Approved | ||
12/15/2004 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :*/VACUUM TEST OK ON PUBLIC M-H #1 . WILL NEED VERIFICATION OF GRADE AND APPPROVAL FROM ADEQ BEFORE FINAL IS GIVEN | |
11/16/2004 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :*/8" DIP FROM M-H #2 TO M-H #1 OK SUBJECT TO APPROVED REVISED PLAN ON JOB CONTRACTOR WILL TEST AT LATER DATE AND PROVIDE VARIFICATION OF GRADE. | |
09/24/2004 | PLUMBING - ROUGH, SOIL | Partial Approval | 1)SEWER EXTENSION AT BLDG #2 AS REDLINED ON PLAN OK TO COVER SUBJECT TO REVISED APPROVED PLAN 2)SEWER BRANCH AT BLDG #3 LOWERED OK. OK TO COVER | |
09/20/2004 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :*/1)WORK COVERED WITHOUT INSPECTION | |
07/08/2004 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :*/ 1) TEST FROM M-H# 6 TO MH #7 TEST OK | |
06/29/2004 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | ||
06/22/2004 | PLUMBING - ROUGH, SOIL | Partial Approval | GREASE INTERCEPTORS EAST SIDE OF BLDG. GREASE TRAPS PARTIAL ONLY TEST ON HCS UP TO bldg. please see sec. 1008.0 - A VENT FOR INTERCEPTOR IS REQUIRED NOT ON PLAN AT THIS TIME. | |
06/15/2004 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :*/ GREASE INT #2 - OK TO BACKFILL. C.O. INSTALLED - CONTRACTOR WILL TEST AT LATER DATE. | |
06/14/2004 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :*/ GREASE TRAP #2011 INSTALL CO. FROM MH 8 TO MH 9 OK TO BACKFILL. CONTRACTOR WILL TEST AT LATER DATE. | |
06/09/2004 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :*/ 1) TEST ON SITE SEWER AND BRANCHES FROM M-H #4 TEST OR WILL REQUIRE VERIFICATION OF GRADE AND VACCUM TEST ON M-H | |
06/08/2004 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :*/ APPROX. 40' NORTH OF M.H. #8 OK TO COVER. TEST M.H. #3 TH M.H. #2 NOT READY. | |
06/07/2004 | PLUMBING - ROUGH, SOIL | Partial Approval | MH 5 TO MH 8 OK TO BACKFILL. WILL REQUIRE VERIFICATION OF GRADE AND TEST AT LATER DATE. | |
06/04/2004 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :*/ BLDG 1 GREASE LINE TO INTERCEPTOR OK ANS HCS. | |
06/03/2004 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :*/ HCS TO OFFICE BLDG. | |
06/02/2004 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | ON GREASE LINE | |
05/18/2004 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :*/ BLDG 5 - HCS'S OK TO BACKFILL. | |
05/14/2004 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :*/ HCS #5 ON BLDG 6. HCS #1 & 2 ON BLDG 5. SUBJECT TO APPROVED SPEC. | |
05/10/2004 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :*/ 1) BLDG #5 HCS 4 UNITS FROM WEST SIDE OF BLDG #5 PARTIAL SPEC CALLS FOR SMITH BLAIL. ROMAC HAS BEEN INSTALLED. NEED A REVISION BEFORE APPROVAL IS GIVEN. NO TEST AT THIS TIME. CONTRACTOR TO PROVIDE AIR AT LATER DATE. IF YOU COVER YOU DO IT AT YOUR OWN RISK | |
04/29/2004 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :*/ HCS BLDG #6 UNIT 'C' ONLY | |
04/28/2004 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :*/ HCS FOR 'D' AND 'E' ONLY. WILL REQUIRE A TEST ON COMPLETE SYSTEM TO VERIFICATION OF GRADE AT LATER DATE. | |
04/27/2004 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :*/ HCS FOR UNIT 6 ONLY. | |
04/21/2004 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection 0000*/ SOUTH END OF BLDG 2 HCS OK. NORTH END OF BLDG 3 HCS OK. | |
04/20/2004 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection 0000*/ 6" FROM M.H. #6 - NORTH. OK TO BACKFILL | |
04/15/2004 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection 0000*/ HCS FOR BLDG #3 - SOUTH OK TO BCKFILL. | |
04/13/2004 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection 0000*/ HCS FOR NORTH END OF BLDG 4 OK./ NOT READY - SOUTH END OF #3 | |
04/09/2004 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection 0000*/ 8" SDR 35 FROM MH #6 TO MH #7 WITH 6" SDR STUB TO EAST OK. I WILL REQUIRE AIR TEST AT LATTER DATE WITH VERIFICATION OF GRADE. THIS IS REWORKED FROM 3/23/04 BECAUSE OF INVERT PROBLEMS AND MAY REQUIRE REVISED APPROVED PLAN. | |
04/08/2004 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection 0000* | |
03/24/2004 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection 0000*/ HCS OUT OF M.H. #7 OK. | |
03/23/2004 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection 0000*/ FROM M.H. 6 TO M.H. 7 AND HCS FOR SOUTHSIDE #3, OK TO BACKFILL. PROVIDE VERIFICATION OF GRADE. CONTRACTOR WILL TEST AT LATER DATE. | |
03/22/2004 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection 0000*/ 1) FROM M.H. #5 TO M.H. #6 OK TO BACKFLOW FILL CONTRACTOR AND PROVIDE TEST AND VERIFICATION OF GRADE. WILL REQUIRE VACCUM TEST ON MANHOLES | |
03/18/2004 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection 0000* | |
03/16/2004 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection 0000*/ FROM M.H. 4 TO M.H. 3 - 8" SAR 35 OK TO BACKFILL. CONTRACTOR WILL TEST AT LATER DATE. PLEASE PROVIDE VERIFICATION OF GRADE. | |
03/15/2004 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection 0000*/ M.H. 4 TO M.H. 5, 158' SDR 35 - 8". OK TO BACKFILL SUBJECT TO VERIFICATION OF GRADE. CONTRACTOR WILL AIR TEST AT LATER DATE. WILL REQUIRE VACUUM TEST ON MANHOLES. M.H. 4 TO M.H. 3 COVERED WITHOUT INSPECTION. | |
03/11/2004 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection 0000*/ INFO ONLY: SEWER HAS BEEN COVERED AT THIS TIME. I WILL NEED DIRECTION FROM STEVE LONG FOR FUTURE INSP. SEWER HAS BEEN COVERED FROM M.H. #2 TO M.H. #3. | |
06/21/2002 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :*/ FROM M-H 2 TO MH 3 TEST OK AND ITS BRANCHES 5 LBS - 15 MIN. ALSO TEST FROM MH 3 TO MH 4 TEST OK 5 LBS, 15 MIN. WILL REQUIRE VACUUM TEST ON MANHOLES AND VERIFICATION OF GRADE. |