Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date |
Description |
Inspector |
Results |
Comments |
| 05/21/2004 |
PLUMBING - GAS PRESSURE TEST |
|
Approved |
CORRECTION MADE. NOW 1" SCOTCH COAT FROM METER UNDERGROUND TO WATER HEATER, 3/4 UP TO ROOF TOP UNIT AND STOVE. 17 PSI AIR TEST OK |
| 05/17/2004 |
PLUMBING - GAS PRESSURE TEST |
|
Not ready for Inspection |
IVRS - Inspection :*/ 1) PROVIDE ROOF FLASHINGS AT PENETRATIONS THRU ROOF. 2) SUPPORT PIPING ON ROOF AT CORRECT INTERVALS AND CLAMP TO SUPPORTS. 3) PRIME AND TAPE ALL UNDERGROUND JOINTS AND TOOL MARKS ON PIPE. 4) RETEST AND HAVE MIN. 10 PSI TEST ON SYSTEM. 5) SUPPORT PIPING AT STOVE DROP. |
| 04/19/2004 |
PLUMBING - GAS PRESSURE TEST |
|
Not ready for Inspection |
IVRS - Inspection 0000* |
| 03/03/2004 |
PLUMBING - GAS PRESSURE TEST |
|
Denied |
|
| 02/27/2004 |
PLUMBING - GAS PRESSURE TEST |
|
Denied |
IVRS - Inspection 0999* |