Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: T04PL00370

Parcel: 127050350


Addresses:

4757 E 4TH ST

Inspection Status: Approved

Inspection History: PLUMBING - GAS PRESSURE TEST

Date Description Inspector Results Comments
03/02/2004 PLUMBING - GAS PRESSURE TEST Approved IVRS - Inspection 0000*/ 10 PSI TEST FROM METER EXISTING PIPING TO FURNACE, WTR HTR, STOVE APPROVED. ALL CORRECTIONS MADE. GAS CARD AT METER. 889-1888.
03/01/2004 PLUMBING - GAS PRESSURE TEST Not ready for Inspection IVRS - Inspection 0000*/ 1) UNION AT METER SHALL BE REPLACED BY LEFT-RIGHT NIPPLE AND COUPLING 2) PROVIDE PERMANENT CAP ON FURNACE VENT IN FURNACE CLOSET 3) PROVIDE PROPER BONDING FOR GAS PIPING 4) GAS TEST GAUGE TO BE IN 1/10 INCREMENTS TO PROVIDE MINIMUM 10 PSI PRESSURE TEST FOR 15 MINUTES TO OBSERVE ANY PRESSURE DROP 5) PROVIDE APPROVED CAP AT PIPING IN FURNACE CLOSET 6) COMBUSTIBLE VENTS WITHIN 10' OF COOLER INTAKE TO BE 3' ABOVE COOLER