Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 03/12/2004 |
PLUMBING - FINAL |
|
Approved |
IVRS - Inspection 0000*/ 14 PSI PRESSURE TEST FROM METER EXISTING 3/4 NEW PIPING ABOVE GROUND TO ROOF TO WTR HTR AND FURNACE. APPROVED GAS CARD AT METER. S.W. GAS 889-1888. |
| 03/01/2004 |
PLUMBING - FINAL |
|
Not ready for Inspection |
IVRS - Inspection 0000*/ 1) STILL NEED PETITION OF APPEAL FORM FOR ALTURNATE FORM OF T & P RELIEF 2) PROVIDE WORKING PRESSURE GAUGE 3) LEFT-RIGHT NIPPLE AND COUPLING SHALL BE USED WHERE UNION IS NECESSARY. RETEST AND CALL IN |
| 02/20/2004 |
PLUMBING - FINAL |
|
Not ready for Inspection |
IVRS - Inspection 0000*/ 1) 10 PSI PRESSURE TES ON ENTIRE SYSTEM. 2) APPROVED COUPLINGS AT METER LOCATION. 3) AGA OR CSA APPROVED GAS VALVE AT SERVICE AND ALL APPLIANCES. 4) COMBUSTABLE VENTS WITHIN 10' OF COOLER TO BE 3' ABOVE TOP OF COOLER. 5) WTR HTR T&P TO GRAVITY DRAIN TO DAYLIGHT OR PROVIDE PETITION OF APPAEL ON SITE WITH THAT FORM OF INSTALLATION. 6) PROPER BONDING OF BLDG GAS PIPING. |