Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 03/08/2004 |
PLUMBING - FINAL |
|
Approved |
IVRS - Inspection 0000*/ CORRECTION MADE. GAS CARD AT METER. |
| 03/05/2004 |
PLUMBING - FINAL |
|
Not ready for Inspection |
IVRS - Inspection 0000*/ 12 PSI PRESSURE TEST FROM METER NEW 3/4" STEEL TO WATER HEATER , 2 WALL HEATERS AND STOVE APPROVED. 1) BONDING TO BE INSTALLED CORRECTLY. 2) WALL HEATER VENT TO BE APPROVED MATERIAL AT ROOF PENETRATION WITH APPROVED CAP. 3) T&P FOR WTR HTR TO BE 6" TO 24" ABOVE FINISHED GRADE. |
| 03/01/2004 |
PLUMBING - FINAL |
|
Not ready for Inspection |
IVRS - Inspection 0000*/ 1) PROVIDE ROOF FLASHINGS AT PIPE PENETRATIONS THRU ROOF 2) PROVIDE APPROVED VENT AND CAP FOR FURNACE VENT. DOUBLE WALL FLU VENT PIPE OR CONNECT 3) SECURE PIPING 4) PROVIDE BONDING OF GAS PIPING. 2 CLIMPS (BRASS) #4 OR #6 COPPER WIRE 5) WATER HEATER TEMPERATURE AND PRESSURE RELIEF TO GRAVITY DRAIN TO DAY LIGHT. RETEST AND CALL BACK IN |