Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date |
Description |
Inspector |
Results |
Comments |
| 02/23/2004 |
PLUMBING - GAS PRESSURE TEST |
|
Approved |
IVRS - Inspection 0000*/ 10 PSI TEST NEW 1" FROM METER TO WTR HTR, FURNACE, STOVE APPROEVED. GAS CARD DROPPED AT METER. 1) COMBUSTABLE VENTS WITHIN 10' OF COOLER INTAKE TO BE 3' ABOVE COOLER. |
| 02/20/2004 |
PLUMBING - GAS PRESSURE TEST |
|
Not ready for Inspection |
IVRS - Inspection 0000*/ please have someone present at time of inspection. |
| 02/18/2004 |
PLUMBING - GAS PRESSURE TEST |
|
Not ready for Inspection |
IVRS - Inspection 0000*/ 1) UNION AT SERVICE SHALL BE PRECEEDED BY AGA OR CSA GAS VALVE. 2) PROPER BONDING OF GAS PIPING IS REQUIRED. 3) WTR HTR T&P TO GRAVITY DRAIN TO DAYLIGHT. |