Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 02/09/2004 |
PLUMBING - FINAL |
|
Approved |
IVRS - Inspection 0000*/ WATER TEST TO TIE-IN CONNECTION OK. CORRECTIONS MADE. |
| 02/04/2004 |
PLUMBING - FINAL |
|
Not ready for Inspection |
IVRS - Inspection 0000*/ 1) WTR TEST OR AIR TEST PIPING. 2) PIPING MUST BE INSTALLED ON FIRM BEDDING. 3) 2 WAY CLEAN OUT TO BE INSTALLED SO ALL OF LINE CAN BE CLEANED OUT. 4) CHECK FALL ON PIPING. MUST GRAVITY DRAIN ΒΌ" PER FOOT ON ENTIRE RUN. |