Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date |
Description |
Inspector |
Results |
Comments |
| 02/02/2004 |
PLUMBING - GAS PRESSURE TEST |
|
Approved |
IVRS - Inspection 0000* |
| 01/29/2004 |
PLUMBING - GAS PRESSURE TEST |
|
Not ready for Inspection |
IVRS - Inspection 0000*/ 1) THREAD PROTECTORS MUST BE REPLACED WITH APPROVED COUPLINGS. 2) WTR HTR VENT TO VENT UPHILL AT LEAST ΒΌ" PER FOOT. 3) WTR HTR T & P MUST TERMINATE DOWN TO FLOOR AREA. 4) STOVE GAS TO BE HARD PIPED OUTSIDE APPLIANCE HOUSING. 5) APPROVED VALVES CSA OR AGA AT ALL APPLIANCES. 6) FURNACE VENT MUST TERMINATE 3' ABOVE COOLER WHEN WITHIN 10' OF INTAKE, WITH DOUBLE WALL AT ROOF PENETRATION AND APPROVED CAP. |